Tuesday, September 15, 2015

reno and demo: stage nine (final days)


We are less than two weeks from moving day. TWO WEEKS! I am trying my best not to lose my mind in this move. 

Over the weekend we got the dining room and kitchen painted and finished. 



As you can see, the counters are covered in paper because we are getting the floors done sometime this week-hopefully. The floor refinishing process makes a huge mess and produces a ton of dust, so we covered as much as we could to reduce the clean-up afterwards. 

You can also see at the top of the walls/ceilings we are missing some crown molding. Our contractor will be installing the crown molding once the floors are finished and able to be walked on. We are hoping to get the floors done on Friday because our contractor is free on Thursday to install the crown molding. 

Keeping this post short and sweet so we can do some final touches to the house while the floors are getting re-finished. 

No comments:

Post a Comment